New homes and major renovations

Plan the lift while the project can still adapt

Resolve the lift system, shaft and construction interfaces before key structural and interior decisions are locked in.

Owner-led project reviewResponse within one business day

The Prime approach

Make the lift part of the home from the beginning

Early lift input helps the homeowner, architect and builder allow for the right footprint, shaft, pit, headroom, door openings, power, access and installation sequence.

Prime works directly with the project team to turn the lift from a late inclusion into a coordinated part of the design and construction programme.

What this service covers

Practical decisions for a complete home-lift project

01

Concept and architectural plan reviews

02

Lift type and configuration advice

03

Shaft, pit and headroom coordination

04

Landing, door and power requirements

05

Installation access and sequencing

06

Cabin finishes aligned with the interior

How it works

From concept plans to handover

  1. 01

    Review the concept

    Prime reviews the plans, number of stops, intended users, design priorities and project timing.

  2. 02

    Select the lift pathway

    A suitable system and configuration are identified before the shaft is finalised.

  3. 03

    Coordinate the build

    Technical requirements are shared with the architect, builder and relevant trades.

  4. 04

    Install and hand over

    Prime coordinates delivery, installation, testing, commissioning and operating guidance.

Common questions

What homeowners and project teams ask first

When should we involve Prime?

Ideally during concept design or before the shaft and structural details are finalised.

Can Prime review architectural plans?

Yes. Early drawings are often enough to identify spatial and coordination issues before detailed documentation.

Does Prime work directly with builders and architects?

Yes. Prime provides the relevant lift requirements and coordinates the agreed interfaces with the project team.

Who completes the shaft and surrounding building work?

That depends on the selected system and project structure. Prime defines the lift requirements and coordinates with the builder responsible for associated works.

Talk through the project

Get clear advice before locking in the lift or building work.

Share the property and project stage. Adam or Harriet will respond within one business day.